• Menu
  • Product
  • Email
  • PDF
  • Order now
  • DLP® LightCrafterDisplay 3010 EVM Gen2 User's Guide

    • DLPU058A September   2017  – February  2019 DLP3010 , DLPA3000 , DLPC3433 , DLPC3438

       

  • CONTENTS
  • SEARCH
  • DLP® LightCrafterDisplay 3010 EVM Gen2 User's Guide
  1.   DLP® LightCrafter Display 3010 EVM Gen2 User's Guide
    1.     Trademarks
    2. 1 DLP® LightCrafter™ Display 3010 EVM Gen2 Overview
    3. 2 Safety Instructions
    4. 3 Applicable Documents
    5. 4 What is in the DLP LightCrafter Display 3010 EVM?
    6. 5 Light Engine
    7. 6 Quick-Start Procedure
    8. 7 Circuit Description
      1. 7.1 Connectors and Switches on Main Board
      2. 7.2 Connectors on DLP LightCrafter Display Board
    9. 8 EVM Setup
  2.   Revision History
  3. IMPORTANT NOTICE
search No matches found.
  • Full reading width
    • Full reading width
    • Comfortable reading width
    • Expanded reading width
  • Card for each section
  • Card with all content

 

EVM USER'S GUIDE

DLP® LightCrafterDisplay 3010 EVM Gen2 User's Guide

DLP®LightCrafter™ Display 3010 EVM Gen2 User's Guide

This user’s guide presents an overview of the DLP®LightCrafter™ Display 3010 evaluation module (EVM) Gen2 and a general description of the main features and functions. It explains the first steps to get started, and shows a detailed description of on board LEDs, connectors and overall EVM assembly. It will give the user a successful start with their first DLP LightCrafter Display 3010 Gen2 evaluation module.

Trademarks

LightCrafter is a registered trademark of Texas Instruments.

LightCrafter, E2E are registered trademarks of TI.

DLP is a registered trademark of TI.

All other trademarks are the property of their respective owners.

1 DLP® LightCrafter™ Display 3010 EVM Gen2 Overview

DLP3010 DLP002_DLPDLCR3010EVM-G2_rev2.jpgFigure 1. DLP LightCrafter Display Complete EVM

In addition to this document, the following documents shown in Section 3 should be used.

 

Texas Instruments

© Copyright 1995-2025 Texas Instruments Incorporated. All rights reserved.
Submit documentation feedback | IMPORTANT NOTICE | Trademarks | Privacy policy | Cookie policy | Terms of use | Terms of sale